Responsible for overseeing the Electrical Energy Isolation and Lock-out and tagout (LOTO) compliance and implementation by the EPC Contractor and Subcontractors during the Pre-Commissioning & Commissioning activities throughout the EPC-1 Onshore facility. This primarily involves direct interaction with the EPC Contractor PTW and LOTO team as well as field auditing of the implementation during pre-comm/comm activities, SIMOPS and at handover of the facility to the start-up team. Provides clear guidance to the EPC Contractor and facilitates resolution isolation/de-isolation activities during pre-comm/comm phase to meet project objectives and milestones.
Predominantly field based to assist and review electrical energy isolations and involvementation of lock-out and tag-outs.
Provides Electrical expertise & guidance, to lead safe execution of the Electrical Pre-Comm and Commissioning scope of work in accordance with project deliverables and execution schedule.
Assist to develop, review and approve Electrical method statements, Job Safety Analysis , procedures, work packages, and provides supervision of pre-comm/comm scope of work by EPC contractor.
Guides EPC Contractors Electrical pre-comm/comm activities and validating, implementation of safe electrical work practices, isolations and de-isolations; adherence to project objectives, requirements, specifications and adhere to Project SHES procedures
Actively participate in Tool Box Talks, Task Instructions and SHES related walkdowns.
Interfaces (pre-commissioning and commissioning) with existing operating facilities and other EPC Projects.
Major Challenges include:Closely interact with EPC Contractor and pre-comm/comm team to ensure , Electrical Energy Isolation/De-isolation and LOTO practices are followed by Vendors and Sub-cntractors per project SHES procedures and requirements.
Ensure during pre-comm/comm activities usage of correct PPE and Electrical tools in line with international Electrical Safety procedures and practices.
Identification and develop electrical isolation points to support pre-comm/comm activity of systems/sub-systems to meet NFE project objective and schedule.
Develop a system to manage and monitor Electrical Energy Isolation/De-isolation and LOTO across NFE EPC1 Onshore facility during pre-comm/comm phase to start up.
Work safely and effectively with adherence to project protocols.