£˜˜˜˜˜˜˜˜Personally responsible for own safety and conducting ones self to the standards of Nabors Policies and Procedures£˜˜˜˜˜˜˜˜Promote and promulgate Nabors safety program£˜˜˜˜˜˜˜˜Apply Nabors safety policies and practices in rig operations and act as a role model to other crew members in all safety matters£˜˜˜˜˜˜˜˜Conduct and record Tool Box Talks for the rig crew and achieve the participation and contribution of crew members£˜˜˜˜˜˜˜˜Play a full part in rig safety meetings£˜˜˜˜˜˜˜˜Conduct safety inspections of rig equipment and hold training drills as directed by Rig Manager£˜˜˜˜˜˜˜˜Contribute to New Employee Safety Inductions£˜˜˜˜˜˜˜˜Ensure that all activities, including those of third party contractors, are conducted using safe working practices and using the designated Personal Protection Equipment (PPE
Operations
£˜˜˜˜˜˜˜˜Plan the tourly operations and conduct pre-job briefings or J.S.A.?s for the crew on activities£˜˜˜˜˜˜˜˜Operate the rig equipment within its designed parameters in a manner to optimize the drilling process and associated activities£˜˜˜˜˜˜˜˜Conduct visual, and where possible functional, inspections of equipment both prior to use and at periodic intervals£˜˜˜˜˜˜˜˜Supervise the Assistant Driller and Derrickman in control and recording of mud properties
˜˜Recording & Reporting
The Driller is responsible for keeping accurate and complete records as required and detailed in the RMS.˜These include:£˜˜˜˜˜˜˜˜Keep accurate BHA Worksheet records of the drill string including details of equipment run in-hole£˜˜˜˜˜˜˜˜Accurately complete the IADC tour sheet£˜˜˜˜˜˜˜˜Keep records of Tool Box Safety Talks£˜˜˜˜˜˜˜˜Ensure that the rig crew conduct and record their assigned tasks in the rig Planned Maintenance System (PMS)£˜˜˜˜˜˜˜˜Complete records of any Incident, Injury, Illness or Near Miss involving rig crew members£˜˜˜˜˜˜˜˜Keep records and charts of BOP pressure tests and of function tests£˜˜˜˜˜˜˜˜Provide recommendations to the Rig Manager for improved procedures£˜˜˜˜˜˜˜˜Report any unforeseen or unusual events to the Rig Manager or Operator?s representative as appropriate